US Salinity Lab Chiller Replacement
Full chiller plant replacement for a USDA research facility, including mechanical system upgrades, controls integration, and federal documentation closeout.
A sample of our completed federal contracts — on time, on spec, and fully compliant.
Full chiller plant replacement for a USDA research facility, including mechanical system upgrades, controls integration, and federal documentation closeout.
Complete removal and replacement of 140,000 SF of flooring across two Wayne County middle schools, including Tarkett LVT and rubber cove base. Delivered on schedule before school year start.
Full flooring replacement at the Northern Cheyenne Community Health Center, a federal Indian Health Service facility — completed on schedule and in full compliance with IHS documentation and safety requirements.
Complete replacement of medium voltage switchgear serving a federal correctional institution — critical life-safety electrical infrastructure delivered in a high-security environment with zero disruption to facility operations.
Pavement repair and restoration along a primary base roadway at Dover AFB, including milling, repaving, striping, and all DoD safety and compliance requirements.
Preventive maintenance on active operational airfield pavements at Dover AFB — crack sealing, joint seals, spall repairs, and FAA-compliant full-depth asphalt patching on one of the nation's busiest military air bases.
Every completed project — across agencies, trades, and locations nationwide.
76 projects
Removal and replacement of an existing Mitsubishi unit with a 3-ton 15.9 SEER wall-mounted heat pump at a USDA Forest Service guard station.
Removal and replacement of a 7.5-ton three-phase split heat pump with electric backup heating at the Eldorado National Forest nursery office.
Full replacement of gas-fired furnaces, coils, and condensing units at the Badlands National Park conference building.
Replacement of an existing gas furnace and AC system with a 3-ton 14 SEER heat pump with 10kW auxiliary heater at a FWS residential quarter.
Removal and replacement of two furnaces and two condensing units at a USDA Forest Service facility.
Replacement of five condensing heat pumps and five indoor air handlers at the Willow Beach National Fish Hatchery, serving four residential quarters and a loft.
Crane-assisted removal and replacement of a packaged gas-electric HVAC unit at the Hammond Fire Station in Sequoia National Park.
Removal and replacement of a 4-ton rooftop A/C unit, vertical air handler, duct heater, and approximately 275 LF of lineset at the historic Valley Forge Train Station.
Removal and replacement of the gas-fired boiler serving the Lava Beds National Monument Visitor Center, including full federal closeout documentation.
Replacement of mini-split HVAC units at Fort Matanzas and Castillo de San Marcos, including conversion of one ductless system to a ducted configuration.
Removal and replacement of two HVAC systems at the Horseshoe Bend National Military Park visitor center, completed on time and per specifications.
Removal of 11,000 SF of flooring and 2,000 LF of wood base at the Wetlands Acadian Cultural Center, including asbestos abatement, and installation of epoxy, carpet, and new wood base.
Complete flooring replacement across 50,000 SF of an active health clinic on the Cheyenne Reservation, executed in phases to maintain full facility operations.
Resurfacing and re-striping of 26,500 SF of epoxy floor in the Connecticut National Guard AASF helicopter hangar, completed in two phases.
Repair and epoxy coating of maintenance bay floors across three buildings totaling 30,000 SF at the Roland R. Wright Air National Guard Base.
Grinding of existing epoxy and installation of a 5-coat chemical-resistant epoxy system across four buildings totaling 25,000 SF at the Battle Creek Air National Guard Base.
Demolition of existing floor system, re-sloping to drain, and installation of high-performance epoxy across 5,469 SF of animal holding and procedure rooms.
Grinding and 3-part epoxy installation with line striping across 7,000 SF of a restricted-access hangar at China Lake Naval Air Weapons Station.
Tear-out and replacement of 45,000 SF of flooring in the security forces building at Minot AFB, executed in five phases while the building remained fully operational.
Flooring replacement across 36,000 SF including epoxy coating, VCT demolition, concrete polishing, and cove base installation throughout multiple work areas.
Application of urethane and 3-coat epoxy floor coating systems across 15,000 SF of two historic hangars at Fort Vancouver National Historic Site.
Removal of 15,000 SF of carpet and installation of new VCT and cove base at Building 650 on the Presidio of Monterey.
Ceramic tile, carpet tile, and cove base installation across approximately 3,000 SF at Joint Base Elmendorf-Richardson, including the DEERS terminal area.
Flooring replacement including asbestos abatement, luxury vinyl plank, porcelain tile, and cove base at the Minot AFB golf course facility.
Grinding and epoxy floor system installation across a 106,000 SF DLA warehouse depot, completed ahead of the contractual window.
Grinding and epoxy resurfacing of two restricted-access hangars totaling 24,000 SF behind the flight line at McConnell Air Force Base.
Removal of 21,179 SF of quarry tile inside the John H. Kerr Dam Powerhouse and replacement with a flake epoxy system and matching cove base.
Installation of epoxy resinous flooring and cove base in 27 restrooms throughout Great Smoky Mountains National Park, totaling approximately 10,000 SF.
Removal and replacement of 20,847 SF of carpet with new carpet tiles and cove base at Goodfellow AFB, executed in six phases to minimize disruption.
Removal and installation of flooring and cove base across Buildings 723, 906, and 3420 at Goodfellow Air Force Base.
Carpet removal, VCT installation, and cove base work across four buildings totaling 29,884 SF at Goodfellow AFB, completed March 2024.
Surface preparation and installation of a new epoxy floor system with rubber cove base across 7,000 SF at the Will Rogers Air National Guard Base.
Simultaneous flooring, cove base, and HVAC renovation across four buildings at Joint Base Elmendorf-Richardson, including ESD VCT, carpet, and 3-coat non-skid epoxy.
Renovation of shower units inside a low-security federal correctional facility, including tile removal, waterproof membrane, and anti-microbacterial coating systems.
Flooring replacement across Welch Elementary, Madras Middle School, and the county central office, totaling approximately 80,000 SF, completed during summer 2022.
Complete flooring replacement of 95,941 SF at Still Elementary School, including full furniture and fixture moving, completed during summer 2024.
Full flooring replacement across 65,000 SF of McCall Primary School, reaching substantial completion ahead of the school year start.
Full repaving of a 9,320 SF parking lot and roadway including crack repair, tack coat, open-graded crack relief layer, surface course asphalt, and re-striping.
Sealcoating of 51,000 SF of asphalt, crackfilling, infrared patching of 40 areas, and parking lot striping at the USGS National Wildlife Health Center.
Milling and repaving of the parking lot at the USDA Aquatics Animal Research Lab, including concrete repair, ADA-compliant striping, and gate sensor replacement.
Complete removal of a parking lot at Canaveral National Seashore, including asphalt demolition, sub-base preparation, and replanting with native upland vegetation.
Installation of concrete walkways connecting greenhouse entry stoops to the parking lot area at a USDA research facility.
Demolition and removal of an 8,500 SF building slab, 2,680 SF greenhouse, and three outbuildings at the USDA Biological Control of Insects Research Laboratory, with grading and seeding restoration.
Full demolition of a 650 SF greenhouse at the USDA National Sedimentation Laboratory, including asbestos abatement, utility cut-and-cap, and site restoration.
Complete demolition of a 3,600 SF USDA greenhouse including asbestos abatement, utility disconnect, debris hauling, and site restoration with grass seed.
Selective demolition of the USDA Pathology Lab/Headhouse without damaging the attached greenhouse, including boiler removal, water line abandonment, and electrical panel removal.
Interior demolition of a historic 1895 U.S. Coast Guard building across 6,500 SF, including salvage of architectural wood elements and full lead paint compliance.
Electrical feeder and installation work for a new laundry, shower, and restroom building at a USDA Forest Service employee compound in the Caribou-Targhee National Forest.
Demolition of an existing pump house and construction of a replacement facility with new bladder tanks and complete electrical service installation.
Aluminum fibered roof coating application on three USDA buildings covering approximately 7,400 SF of metal roofing with full flashing of all penetrations.
Ongoing series of renovation projects across multiple USDA research buildings covering electrical, HVAC, flooring, and general construction trades since 2016.
Saw-cutting, excavation, and replacement of approximately 110 LF of 4-inch sanitary sewer drain line at a USDA research facility, with concrete slab restoration.
Removal of existing medium-voltage switchgear and installation of a new four-section Eaton switchgear assembly serving the L Housing Unit at FCI II Butner, including low-frequency feeder wire testing.
Removal and replacement of three medium-voltage pad-mounted switchgear units at Tobyhanna Army Depot, including installation of new S&C Electric Vista switchgear and full commissioning.
Complete removal and replacement of an asphalt shingle roofing system and approximately 300 LF of aluminum gutters and downspouts at a historic residential structure within Colonial National Historical Park.
Full re-roofing of a 3,600 SF maintenance shop at Santa Monica Mountains NRA with a hidden-fastener metal panel system, new plywood sheathing, ridge vent, flashing, and gutters.
Mechanical removal and repainting of approximately 5,654 LF of taxi and ramp markings on the HC-130 and helicopter ramps at USCG Base Elizabeth City per FAA Advisory Circular 150/5340-1M.
Preventive maintenance on active operational airfield pavements at Dover AFB — crack sealing of 30,000 LF of asphalt, preformed concrete joint seals, spall repairs, and FAA-compliant full-depth asphalt patching.
Removal and replacement of a ductless split system and gas furnace with new multi-zone Fujitsu heat pump systems at the Spanish Fork Ranger District, Uinta-Wasatch-Cache National Forest.
Supply and installation of a 27.5-ton Trane rooftop unit at the Fermi National Accelerator Laboratory, including new ducting, BACnet controls, sensors, wiring, and electrical circuit upgrades.
Replacement of a failed HVAC compressor at the Blanchard Springs Visitor Center, including refrigerant recovery, system flush, TXV and reversing valve replacement, and recharge.
Removal of deteriorated resinous flooring and installation of a multi-layer chemically resistant epoxy system with non-slip aggregate and safety striping in the fire department bay.
Removal and replacement of 3,620 SF of 3/8-inch black rubberized tile flooring in a mechanical support building on the flight line at Tyndall Air Force Base.
Removal and replacement of carpet, LVT, and trim in 24 dormitory units including bedrooms, living rooms, hallways, and kitchens, with full furniture removal and reinstallation.
Removal and replacement of 10,000 SF of carpet, wall base, and transitions in the MEPS building at Westover ARB, performed with night and weekend phasing to maintain full operations.
One-year task order contract for epoxy floor surface preparation and repair at multiple locations across Tobyhanna Army Depot.
Surface preparation and installation of approximately 6,000 SF of a multi-layer rubber Sikafloor system in the wheel and tire shop at Charleston Air Force Base.
Flooring replacement across two Coweta County fire stations totaling 14,000 SF, including installation of a breathable three-part epoxy system with safety line striping.
Removal and replacement of 4,500 SF of carpet and 1,200 LF of cove base in the recruiting building at Moody Air Force Base, including all furniture moving.
Removal of existing flooring and installation of 2,535 SF of luxury vinyl tile and 6-inch cove base in the Building 546 basement at Minot Air Force Base.
After-hours replacement of approximately 75 LF of 4-inch cast iron sanitary sewer piping in the Automation Wing basement of the Atlanta Air Route Traffic Control Center.
Full exterior surface preparation and repainting of approximately 15,000 SF across the Headquarters and POD buildings at Timucuan Ecological & Historic Preserve.
Exterior preparation and painting of a 2,700 SF historic structure at Timucuan Ecological & Historic Preserve, including window glazing, paint stripping, and three coats of paint and primer.
Removal and replacement of an existing septic tank with a new 1,000-gallon precast concrete tank and all associated piping connections at a USDA facility.
Removal of existing wooden railing and fabrication and installation of approximately 170 LF of custom steel fencing with concrete footings at William Howard Taft National Historic Site.
Abatement and disposal of galvasbestos siding, PCB ballasts, mercury switches, and other hazardous materials from three buildings at Crab Orchard National Wildlife Refuge.
Abatement of approximately 2,490 SF of asbestos-containing floor tile and adhesive, followed by installation of luxury vinyl plank flooring and new cove base at USDA Northern Research Station 13.
Qualified subcontractors who bring professionalism, clear communication, and federal project experience are encouraged to reach out. We work with trades who meet our standards and deliver.